Clearance testing in Clifton: what to know
Clifton's working-class residential neighbourhoods have two-family and three-family homes from the 1930s–1950s with block foundations and original plumbing — basement moisture and mold are a common maintenance issue.
Areas of Clifton adjacent to the Passaic River (particularly the Allwood and Richfield sections) have documented flood risk — basement flooding during Passaic River events has caused significant water damage in these areas.
Mold conditions in Clifton
Common mold types in this area: Cladosporium (masonry basement); Stachybotrys (Passaic River flood-affected properties); Aspergillus/Penicillium (basement storage and laundry areas).
We serve Yogi Berra Museum, Montclair State University (nearby), Styertowne Shopping Center, Passaic River and the wider Clifton area across ZIP codes 07011, 07012, 07013, 07014.
Signs you need clearance testing
- Remediation has been completed and containment is still in place
- The written protocol specifies clearance testing as a completion requirement
- A real estate transaction requires documented proof of successful remediation
- An insurance claim requires certified clearance documentation
- The remediator has offered to perform their own clearance (this should be declined)
- A previous clearance test failed and re-clearance is required after additional work
How we handle clearance testing in Clifton
Clearance testing is the final step of any IICRC S520-compliant mold remediation and the critical quality control measure that confirms the work was done correctly. The clearance test must be performed by an independent licensed mold assessor — the company or individual that performed the remediation cannot perform their own clearance test. This independence is mandated by the NYS 2015 Mold Law and is best practice in all markets.
The timing and conditions of clearance testing are specified in the written remediation protocol. Standard protocol requires that containment remains fully in place when samples are collected, that the HEPA-filtered negative air machine has been running for at least 4 hours before sampling, and that an outdoor control sample is collected simultaneously with indoor samples.